A hydrophobic coating for properly prepared yacht paint and gelcoat. We inspect the surface first, then define the preparation, product, maintenance requirements and coverage in writing.
Reference price before applicable taxes. Surface preparation and covered area are confirmed after inspection.
See the ProcessCeramic coating is a liquid protection system applied to a properly cleaned and prepared surface. Once cured according to the product instructions, it adds hydrophobic behavior and can make routine salt and dirt removal easier.
Helps water bead and reduces the adhesion of salt and common surface contaminants.
Adds a sacrificial coating layer, but does not make the surface scratch-proof or replace impact protection.
Preparation, cure time and compatibility are defined for the selected product and existing finish.
A compatible coating can make routine salt and grime removal easier. Product limits and approved cleaners are stated in the care instructions.
Coating can enhance the gloss of a well-prepared surface. The final result depends primarily on the condition and correction of the underlying paint or gelcoat.
Hydrophobic behavior can reduce contaminant adhesion, while regular gentle washing and periodic inspection remain necessary in Cartagena's marine environment.
Salt, mineral deposits, organic residue and other visible contaminants are removed with products compatible with the existing finish and selected coating system.
Estimated stage: 4–6 hours, depending on size and condition
Polishing may be recommended to address oxidation and correctable surface defects before coating. Severely deteriorated gelcoat or paint may require a different repair or refinishing service.
Estimated stage: confirmed after surface inspection
The selected ceramic product is applied in controlled sections and layers, following its specified flash, leveling and cure times.
Estimated stage: depends on product, area and number of layers
The coating is allowed to cure under suitable conditions. We inspect uniformity, level the finish where the product requires it and document the completed scope.
Estimated stage: determined by product cure requirements
You receive the written first-wash window, compatible cleaning products, inspection guidance and any maintenance steps required by the selected system.
Handover: written care guide and service record
Important: Initial cure and first-wash times vary by product and ambient conditions. We provide the exact written restrictions for the selected system at handover.
First step: inspect and prepare the substrate
Coating performance begins with compatible, stable paint or gelcoat. Oxidation, defects and contamination are addressed before application within the approved scope.
Defined in writing: product, layers and cure
We match the coating system to the surface, exposure and desired maintenance plan. Expected durability follows the product data and the conditions in the written quote.
Ongoing care: compatible washing and inspection
Sun exposure, salt, washing methods, storage and maintenance all affect performance. No single lifespan applies to every vessel.
Frequently Asked Questions
Send us photos and basic vessel details. We will assess whether the surface is suitable and provide the preparation, coating system, maintenance plan and coverage in writing.
Request a Surface Assessment